Sydney Water Data Centre

The project involved the refurbishment of the existing fully operational data centre with the intent to improve the redundancy and maintainability of the existing data centre. Work was completed to Ground Floor and Level 1 of Building C.

Barnwell Cambridge were engaged under a Design and Construct Contract to consolidate the data centre into a refurbished environment complete with modern energy efficiencies, and to allow the facility to double its data centre floor space capacity. Additionally Barnwell Cambridge was engaged to complete a design to allow for the maintenance of electrical systems, whilst maintaining IT power. Thereby creating redundancy to IT and Mechanical Equipment through the re-configuration of the electrical supplies.

  • New Consumer Mains
  • New Main Switchboards and Distribution Boards
  • New Power Factor Correction Cubicles
  • Sub mains
  • General Power and lighting
  • Emergency escape lighting and  exit signage
  • Lighting Control
  • Final sub circuits, outlets and accessories    
  • Communications
    • Backbone and lead in Fibre cabling
    • Structured Cabling for
      • WI-FI Services
      • Data and Telephone services
  • CCTV Installation
  • Security Installation